How To Install New Service Panel To New Pole Barn In Michigan

LarryFine

LarryFine

Master Electrician Electric Contractor Richmond VA

  • #4

Or does the non-bonded ground bar at the pole barn need to be connected to two ground rods at the pole befouled? This is where the confusion for me e'er starts when using non metalic feeder conduit to the barn.

The barn requires its own GES; a metallic conduit does not change this.

GeorgeB

GeorgeB

ElectroHydraulics engineer (retired)

  • #ten

You DO need two basis rods (if that's what y'all are using for a GEC [grounding electrode conductor]).

Let'due south heighten the ugly UFER head once again ... new pole barn, peradventure concrete floor on grade with steel, if so that must be the GEC connection.

LarryFine

LarryFine

Chief Electrician Electric Contractor Richmond VA

  • #eleven

Let's raise the ugly UFER head once more ... new pole barn, perhaps physical floor on form with steel, if and then that must exist the GEC connection.

Flooring, or simply footings?

  • #15

Allow'due south heighten the ugly UFER caput again ... new pole barn, maybe physical floor on grade with steel, if so that must be the GEC connexion.

Only if the slab is also the footing or structural, and at that place is no vapor retarder under it (which there should be).

Source: https://forums.mikeholt.com/threads/wiring-pole-barn-for-client-in-mi.149796/

Posted by: robinsondectat46.blogspot.com

0 Response to "How To Install New Service Panel To New Pole Barn In Michigan"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel